Handlaying Track And Building Roadbed
My roadbed also had to be low maintenance. It ended up being a trench 4 inches deep by 8 inches wide with plastic nursery liner to control the weeds. I filled the trench with crushed rock (not pea gravel), tamped everything down, and sprinkled it with water. That packed the rock into a sturdy subbase.